• +44 7498 543259
  • info.quickdirectstoreltd@gmail.com
  • Newsletter
  • Contact Us
Wishlist
Login / Register
Subscribe us
  • Home
  • Shop
    • Electronics
      • Chargers / Data Cables
      • Game Accessories
      • Head Phones
      • Memory Card & Accessories
      • TV & HDMI
      • Computer Accessories
    • Kitchen & House hold
    • Car accessories
    • Clothes
    • Tools
    • Pet Products
  • About us
  • Contact us
Search
0 Compare
1 item £4.72
Menu
1 item £4.72
“4 Ports Hub Splitter USB 3.0 High Speed Adapter Multi Desktop PC Laptop” has been added to your basket. View basket
-3%
s l960 34 1
s l960 8 14 1
s l960 7 19
s l960 5 21
s l960 4 21 1
s l960 3 24
s l960 1 22 1
Click to enlarge
s l960 34 1
s l960 8 14 1
s l960 7 19
s l960 5 21
s l960 4 21 1
s l960 3 24
s l960 1 22 1
Home Electronics Chargers / Data Cables USB A to Type C Cable 7A 100W Fast Charger Braided Long Lead 1M 2M
Product Sale Social Media Post 2
UK 3 Pin Mains Wall USB Charging Plug Wall Charger Adapter for iPhone Samsung £10.76 Original price was: £10.76.£6.94Current price is: £6.94.
Back to products
Genuine Samsung Type C USB Fast Charging Data Sync Cable Lead £3.66 Original price was: £3.66.£2.72Current price is: £2.72.

USB A to Type C Cable 7A 100W Fast Charger Braided Long Lead 1M 2M

£3.47 – £3.92

Item Specifics:

  • Condition: New: A brand-new, unused, unopened, and undamaged item in original retail packaging.
  • Brand: Unbranded
  • Compatible Brand: For Samsung
  • Type: Type-C Cable
  • Items Included: Charging Cable
  • Features: Braided, Fast Charge, LED
  • Colour: Black

Item description from the seller

USB Type A to Type C Cable 7A 100W Fast Charge Braided Lead 3M 2M 1M 0.25M For Samsung For iPhone 15

This cable doesn’t support Android Auto.

Clear
Compare
Add to wishlist
SKU: N/A Categories: Chargers / Data Cables, Electronics, Head Phones
Share:
  • Description
  • Additional information
  • Reviews (0)
  • Shipping & Delivery
Description

Introduction to the 7A 100W Fast Charger

The 7A 100W fast charger is a cutting-edge device designed to meet the demands of modern electronic devices. Offering robust performance and rapid charging capabilities, this charger is an essential accessory for both personal and professional use. With the increasing reliance on electronic devices, having a reliable charger that ensures quick power replenishment is crucial.

Key Features and Benefits

One of the standout features of the 7A 100W fast charger is its impressive power output. Delivering up to 100 watts, it can charge multiple devices simultaneously without compromising on speed or efficiency. This makes it a versatile option for users with several gadgets. Additionally, the charger boasts a 7-amp current, which ensures swift power delivery, reducing the time your devices spend tethered to a power outlet.

Advanced Safety Mechanisms

Safety is a paramount concern with charging devices. The 7A 100W fast charger incorporates advanced safety mechanisms to protect your devices from overcharging, overheating, and short-circuiting. These features ensure that your electronics remain safe during the charging process, providing peace of mind to users who depend on their devices for daily activities.

Compatibility and Portability

The fast charger is compatible with a wide range of devices, including smartphones, tablets, laptops, and more. Its compact and lightweight design makes it an ideal travel companion, fitting easily into bags and backpacks. This convenience ensures that you can have rapid charging capability wherever you go, without the bulk of traditional chargers.

Conclusion 7A 100W Fast Charger

In summary, the fast charger is a powerful, reliable, and safe charging solution for today’s tech-savvy individuals. Its high power output, advanced safety features, and broad compatibility make it a must-have accessory for anyone looking to maintain their device’s battery life efficiently. Invest in the fast charger and experience the convenience of rapid charging technology.

Additional information
Weight

50G

Colour

Black

Brand

Unbranded

Type

Type-C Cable

Features

Braided, Fast Charge, LED

sku

sku-69-1m

,

sku70-2m

lenght

1m

,

2m

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “USB A to Type C Cable 7A 100W Fast Charger Braided Long Lead 1M 2M” Cancel reply

Your email address will not be published. Required fields are marked *

Shipping & Delivery
wd ship 1
wd ship 2

MAECENAS IACULIS

Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.

ADIPISCING CONVALLIS BULUM

  • Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
  • Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
  • Diam parturient dictumst parturient scelerisque nibh lectus.

Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.

Related products

-22%
s l1600 3 2
Compare

2 in 1 Adapter Splitter Dual Headphone Audio & Charger For iPhone 13 12 11 X 14P

Electronics, Chargers / Data Cables
£3.96 Original price was: £3.96.£3.07Current price is: £3.07.

Item Specification:

  • Condition: New: A brand-new, unused, unopened, undamaged item in its original packaging.
  • Compatible Brand: For Apple
  • Color: White
  • Items Included: Audio Dock, Charging Cable
  • Compatible Model: For Apple iPhone 12 Pro, For Apple iPhone 13, For Apple iPhone X.
  • Material: Plastic
  • MPN: Does not apply
  • Item Length: 130mm
  • Brand: Unbranded
  • Type: Aux
  • Number of Ports: 2
  • Design/Finish: Plain
  • Connectivity: 3.5mm Jack, 8 Pin
  • Cable Length: 130mm

Description:

100% Brand New and High Quality This Aux Audio Charge Adapter Cable Dongle is designed for iPhone X, XS, XS Max, XR, iPhone 8, 7 Plus, iOS 10, iOS 11, and iOS 12, offering an ideal solution for enjoying music and charging your iPhone simultaneously.

Two Charge Ports Specifications:

  • Supports Audio Output
  • Supports Headset Call
  • Supports Headset Controller
  • Supports Charging Function
  • Color: White
  • Material: ABS
  • Compatible with: iPhone 7 / 7 Plus / 8 / 8 Plus / iPhone X / iPhone XS / XS Max / XR

Two Charge Ports Features:

  • Dual splitter ports allow you to use headphones and charge simultaneously.
  • Supports phone calls, headphone usage, and music control simultaneously.
  • Compatible with iOS 9, iOS 10, iOS 11, and iOS 12.
  • Offers impressive sound quality with up to 48 KHz and 24-bit audio output.
  • Ensures efficient transmission and stable signal with a 100% copper wire core.

Specifications:

  • Material: ABS
  • Color: White
  • Compatible with: iPhone 13 / 12 / 11 / 8 / 7 / 6 / X / XS / XS Max / XR

Features:

  • Supports listening to music while charging.
  • No call function or music volume control.
  • Impressive sound quality with up to 48 KHz and 24-bit audio output.
  • Ensures efficient transmission and stable signal with a 100% copper wire core.

Note:

Before use, connect the headphone and charging cable to the adapter first, then connect the adapter to the cell phone. If the headphone is unplugged during use and no longer works, reconnect it following step 1.
Product Type:
Smartphone & Phone Adapters, Earphone & Headphone Splitter
Transition Words:
Additionally, Moreover, Furthermore, In addition, Consequently, Therefore, Thus, Hence, As a result, Subsequently, Consequently, Ultimately
Add to wishlist
Add to basket
Quick view
-25%
s l960 24 2
Compare

3 in 1 Type C Micro USB to USB Adapter OTG SD TF Card Reader For Samsun Android

Electronics, Chargers / Data Cables
£3.79 Original price was: £3.79.£2.84Current price is: £2.84.

Item specifics

Condition: New: A brand-new, unused, unopened, and undamaged item in original retail packaging. Memory Card(s) Supported:
  • SD
  • MicroSD
  • SDHC
Brand: Lassanitech7 Compatible Brand: Universal Type: Card Reader Connectivity: USB Compatible Model: Universal Country/Region of Manufacture: China EAN: doesnotapply Product Name: TYPE-C Card Reader YC-320 Purpose: Designed for MACBOOK card reading, data transmission, and OTG functionality for SD/TF cards. Model: YC-320 Function: Equipped with TYPE-C/USB/MICROUSB connectors and SD/TF card reader ports. Colour: Black Connector: TYPE-C/USB/MICRO USB Product Size: 7.52.60.9cm Packing Size: 14.98.910cm Electric Power: 2W Power Output: 500mA Operating Temperature: 0°C Shell Material: ABS environmental protection plastic shell with frosted finish Support System: Compatible with Windows 10.8.7, Vista, XP, Mac 10.4.6, MACBOOK 2015/2016, MACBOOK PRO, HP 17, Dell XPS Supported Models: Google Notebook, Microsoft 950XL, Samsung S8, LGV20, Huawei P20, and other computers, mobile phones, and tablets with Type-C/USB/micro USB connectors.
Add to wishlist
Add to basket
Quick view
-30%
s l960 12 1
Compare

All in One 1 Memory Card Reader USB Adapter SD SDHC Mini Micro M2 MMC XD CF MS

Electronics, Memory Card & Accessories
£6.06 Original price was: £6.06.£4.22Current price is: £4.22.

Item Specifics

  • Condition: New, unused, unopened, and undamaged item in original retail packaging.
  • Compatible Brand: Universal
  • Custom Bundle: No
  • Compatible Model: Universal
  • MPN (Manufacturer Part Number): doesnotapply
  • Colour: Black or Black/White
  • Brand: Unbranded
  • Memory Card(s) Supported: CompactFlash II, Memory Stick Duo, Memory Stick, Memory Stick PRO, Memory Stick Micro (M2), CompactFlash I
  • Type: Multi Card Reader
  • Operating System Compatibility: Windows, Mac OSX
  • Manufacturer Warranty: 1 Year
  • Adapter Form Factor: SD
  • Connectivity: USB
  • Compatibility: PC and Mac
  • Country/Region of Manufacture: China

Item description from the seller

Product Description

Description: This multi-card reader offers convenience and efficiency. It supports USB 2.0 full speed specification and USB device class, enabling fast data exchange with MP3 players, digital cameras, and more. It's USB powered, compact, and has a power LED indicator for easy use. Works with XP/Vista/Win 7 or above. Specifications:
  • Item Type: Card Reader
  • Material: Plastic
  • Color: Black
  • Size: 40×68×12mm/1.57×2.68×0.47in (Approx.)
  • Cable length: 49cm/19.29in (Approx.)
  • Quantity: 1 Set (other accessories shown in the picture are not included)
Note:
  1. Please allow slight dimension differences due to manual measurement.
  2. Colors may vary slightly due to monitor differences.
Package includes:
  • 1 X Card Reader (No retail package)
  • 1 X Mini USB Cable
Add to wishlist
Add to basket
Quick view
-38%
s l960 7 4
Compare

Earphones for Apple iPhone 6 6s Plus 5s iPad Headphones Handsfree With Mic 3.5MM

Electronics, Head Phones
£5.08 Original price was: £5.08.£3.17Current price is: £3.17.

Item specifics

Condition New: A brand-new, unused, unopened, and undamaged item in original retail packaging (where packaging applies). Number of Earpieces Double Year Manufactured 2020s Colour White Brand Unbranded Form Factor In-Ear Only Type Earbud (In Ear) Wireless Technology N/A Manufacturer Warranty 1 Month Model iPhone 5 Connectivity 3.5mm Jack Features
  • Built-in Microphone
Microphone Type Built-In Cable Length 1m Country/Region of Manufacture China Personalise No

Item description from the seller

Earphones for Apple iPhone & iPad | Headphones Hands-Free with Mic | 3.5MM Aux Connection 100% Brand New | Great Quality Compatibility:
  • iPhone: iPhone 6S | 6S Plus, iPhone 6 | 6 Plus, iPhone SE, iPhone 5 | 5S | 5C, iPhone 4 | 4S, iPhone 3GS, iPhone 3G.
  • iPad: Compatible with all iPad models with a 3.5mm jack.
Features:
  • High-Quality Audio: The speakers inside the headphones have been engineered to maximize sound output and minimize sound loss, ensuring you get the best audio experience.
  • Built-in Remote: Includes a remote that lets you adjust the volume, control the playback of music and video, and answer or end calls with a pinch of the cord.
  • Ergonomic Design: The design is defined by the geometry of the ear, making them more comfortable for more people than any other earbud-style headphones.
Specifications:
  • Condition: New
  • Number of Earpieces: Double
  • Year Manufactured: 2020s
  • Colour: White
  • Brand: Unbranded
  • Form Factor: In-Ear Only
  • Type: Earbud (In Ear)
  • Wireless Technology: N/A
  • Manufacturer Warranty: 1 Month
  • Model: iPhone 5
  • Connectivity: 3.5mm Jack
  • Microphone Type: Built-In
  • Cable Length: 1m
  • Country/Region of Manufacture: China
  • Personalise: No
These earphones provide excellent sound quality, a comfortable fit, and convenient controls, making them a perfect accessory for your Apple devices.
Add to wishlist
Add to basket
Quick view
-21%
s l960 23
Compare

FOR QI Wireless Charging Receiver Android iPhone USB-C Micro Charger Adapter UK

Electronics, Chargers / Data Cables
£4.29 Original price was: £4.29.£3.39Current price is: £3.39.

Item specifics

Qi Wireless Charging Receiver by Lassanitech7

  • Condition: New in original packaging
  • Compatibility: Universal (Alcatel, Apple, Google, Honor, HTC, Huawei, Lenovo, LG, Motorola, Nokia, Samsung, Xiaomi)
  • Included: Charging unit
  • Compatible Models: Micro USB Phone, Android, iPhone
  • MPN: Type C Micro iPhone Wireless Charging Receiver
  • Material: Acrylic
  • Mounting Type: Clip
  • Colour: Black
  • Brand: Lassanitech7
  • Type: Charging Receiver
  • Number of Ports: 1
  • Manufacturer Warranty: 1 Year
  • Voltage: 5V
  • Design/Finish: Aluminium
  • Connectivity: Micro-USB, USB-C, Wireless, iOS
  • Wireless Charging Standard: FOR QI
  • Country/Region of Manufacture: United Kingdom
  • Mounting Location: Base
  • Features: Wireless Charging
  • Cable Length: Wireless
  • EAN: Does Not Apply

Item description from the seller

QI Wireless Charging Receiver for Mobile Phones

Experience the convenience of wireless charging with our QI Wireless Charging Receiver. Designed for iPhones, Samsung, and most other phones with Micro USB and Type C ports. Features:
  • Low Heat Emission: New improved high-efficiency Qi wireless receiver module chip ensures minimal heat generation.
  • Ultra-Thin and Portable: Lightweight design for use at home, office, or on the go.
  • Compatibility: Fits iPhone, Samsung, and most other phones with Micro USB and Type C ports.
  • Note: Ensure proper placement on the wireless charger pad's magnetic inductive center for optimal charging.
Specifications:
  • Input: 5V
  • Output: 1000mA (Max)
  • Reaction Temperature: -10°C to 40°C
Add to wishlist
Add to basket
Quick view
-24%
Product Sale Social Media Post 1
s l960 15 3
Compare

Genuine iPhone LED Charger Fast Cable USB Lead For 5 6 7 8 X XS XR 11 12 13 Max

Electronics, Chargers / Data Cables
£3.80 Original price was: £3.80.£2.87Current price is: £2.87.

Durable Design

Our USB Cable features a 90-degree connector design with a right-tip angle, protecting the plug and reducing cable strain for long-lasting use. Moreover, the reversible USB design offers added convenience during gaming.

Fast Charging and Data Transfer

Made with high-quality copper wire and a nylon weave capable of withstanding 6000 bends, our cable delivers 2.4A fast charging. Therefore, charging speed is increased by 40%, ensuring efficient power delivery. Additionally, premium thickened copper wiring facilitates swift data transfer for all compatible devices.

LED Light Indicator

Equipped with an LED light indicator, our cable is easy to locate in the dark and can even function as a torch to help you find your charging port or phone. Furthermore, available in 1m or 2m lengths, our cables offer versatility for gaming, charging, and everyday use.

Benefits:

  • Convenient Portability: Lightweight and compact, our USB Cable is easy to carry and transport, making it ideal for travel or everyday use.
  • Durable Materials: Crafted from high-quality materials, our cable resists wear and tear, ensuring reliability for years to come.
  • Organizational Excellence: Featuring multiple pockets and compartments, our cable helps keep your belongings tidy and easily accessible.

Compatible with:

  • iPhone 5, 5C, 5S
  • iPhone 6/6 Plus, 6S/6S Plus
  • iPhone SE (1st, 2nd, 3rd generation)
  • iPhone 7/7 Plus, 8/8 Plus
  • iPhone X, XS/XS Max, XR
  • iPhone 11, 11 Pro/11 Pro Max
  • iPhone 12/12 Mini, 12 Pro/12 Pro Max
  • iPhone 13/13 Mini, 13 Pro/13 Pro Max
  • iPhone 14/14 Plus, 14 Pro/14 Pro Max
  • iPad (4th to 9th generation)
  • iPad Mini (1st to 5th generation)
  • iPad Air

Specifications:

  • Size: 1m or 2m
  • Color: Black, Red
  • Material: Aluminium
  • Model: For Apple

Note:

Due to lighting and screen differences, the item's color may slightly vary from the pictures. Please allow for a 2-3% error due to manual measurement.
Add to wishlist
Add to basket
Quick view
-26%
sdsd
Compare

Genuine Samsung Type C USB Fast Charging Data Sync Cable Lead

Electronics, Chargers / Data Cables
£3.66 Original price was: £3.66.£2.72Current price is: £2.72.

Item Specifics:

  • Condition: New: A brand-new, unused, unopened, and undamaged item in original retail packaging.
  • Features: Fast Charge
  • Custom Bundle: No
  • MPN: C-CABLE-WHT
  • Compatible Model:
    • For Samsung Galaxy Note10
    • For Samsung Galaxy Note20
    • For Samsung Galaxy S10
    • For Samsung Galaxy S20
    • For Samsung Galaxy S21 5G
    • For Samsung Galaxy S21 5G
    • For Samsung Galaxy S22
    • For Samsung Galaxy S22 Ultra
    • For Samsung Galaxy S8
    • For Samsung Galaxy S8
    • For Samsung Galaxy S9
    • For Samsung Galaxy S9
    • For Samsung Galaxy Z Flip
    • For Samsung Galaxy Z Flip4
    • For Samsung Galaxy Z Flip 5G
    • For Samsung Galaxy Z Fold2
    • For Samsung Galaxy Z Fold3 5G
    • For Samsung Galaxy Z Fold4
  • Modified Item: No
  • Material: Plastic
  • Colour: White
  • Non-Domestic Product: No
  • Compatible Brand: Universal
  • Number of Ports: 1
  • Connectivity: USB-C
  • Brand: Samsung
  • Design/Finish: Plain
  • Cable Length: 1 m
  • Type: USB-C Cable
  • Items Included: Charging & Data Sync Cable
  • EAN: 5060168462534
"Discover the Genuine Samsung EP-DN930CWE Fast Charger Type-C Cable. This brand-new, original Samsung accessory is compact for travel and ensures simultaneous charging and data transfer to your phone. Please note: main adapter not included."
Add to wishlist
Add to basket
Quick view
s l960 1 3 1
Compare

Mini Milk Frother Electric Egg Beater Hand Shake Whisk Mixer Coffee Tool Kitchen

Electronics, Kitchen & House hold
£3.69

Item specifics

Condition New: A brand-new, unused, unopened, and undamaged item in original retail packaging (where packaging applies). Number of Items in Set 1 Brand Unbranded Type Whisk Theme Coffee Material Plastic, Stainless Steel Features
  • Egg Beater
  • Milk Shake Whisk
  • Milk Frother
  • Tea Mixer
  • Powerful
  • Hot Chocolate Mixer
  • Blender
  • Electric
MPN Coffee Frother Whisk Set Includes Frother Production Style Hand Mixer Production Technique Easy to Use

Item description from the seller

Handle Material Plastic
  • The spring is made from food-approved stainless steel, rust-proof and doesn't break or bend even when used daily.
  • Non-stick, flexible and easy to handle. Easy to clean with a damp cloth.
  • Make your milk all frothy, great for making cappuccino, white coffee and milk shake at home.
  • Can be also used for crack egg, quickly mush eggs without spilt around.
  • Simple sliding switch ergonomic, providing excellent control, smoother using.
Add to wishlist
Select options This product has multiple variants. The options may be chosen on the product page
Quick view

    Explore our wide range of premium mobile accessories and cutting-edge electronics. From protective cases and chargers to the latest gadgets, we have everything you need to stay connected and powered up in style.

    • wd cursor dark Greenfield Mill, Greenfield Road Colne, BB8 9PW
    • wd phone dark Phone: +44 7498 543259
    • wd envelope dark info.quickdirectstoreltd@gmail.com
    Categories
    • Electronics
      • Computer Accessories
      • Chargers / Data Cables
      • Memory Card & Accessories
      • Game Accessories
      • Head Phones
      • TV & HDMI
    • Car accessories
    • Clothes
    • Kitchen & House hold
    • Pet Products
    • Tools
    Pages
    • Home
    • About us
    • Privacy Policy
    • Returns
    • Terms & Conditions
    • Contact Us
    • Latest News
    • Facebook
    • X
    • Instagram
    Based on Quick Direct Store
    • Menu
    • Categories
    • Electronics
      • Chargers / Data Cables
      • Game Accessories
      • Head Phones
      • Memory Card & Accessories
      • TV & HDMI
    • Computer Accessories
    • Accessories
    • Car accessories
    • Clothes
    • Kitchen & House hold
    • Pet Products
    • Tools
    • Home
    • Shop
    • Blog
    • Portfolio
    • About us
    • Contact us
    • Wishlist
    • Compare
    • Login / Register
    Shopping cart
    Close
    Sign in
    Close

    Lost your password?

    No account yet?

    Create an Account
    We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
    Accept
    Start typing to see products you are looking for.
    Shop
    Wishlist
    1 item Cart
    My account